A covered space does not have to arrive fully formed. Many of the best ones we see were built in stages: a roof first, then a glass side on the windy end a year later, then lighting, then perhaps sliding walls across the front. Building this way spreads the cost and, more importantly, means every addition is based on how you actually use the space rather than how you thought you would.
Why Starting Simple Makes Sense
It is hard to know in advance how you will use a new space. You might expect to sit under it mostly in summer and find yourself out there every winter morning with a coffee. You might think the wind comes from the west and discover the real problem is a gust that funnels down the side of the house from the north.
Living with an open veranda for a season shows you exactly where the weather comes from, when you use the space and what would make it better. Then you can add precisely what is needed, no more and no less.

What Can Be Added Later
Most modern veranda systems are modular. The same frame can take a wide range of side elements:
Sliding glass walls across the front or sides, to close the space against wind and rain while keeping the view.
Fixed glass or polycarbonate side walls, often on the side that faces the weather.
Wedges to fill the triangle at the top of a sloping side.
Louvred panels for privacy and shade without closing the space in.
Fabric screens for flexible shelter and privacy.
Lighting and heating, fitted into the structure.
What to Get Right on Day One
The key to adding sides later is planning for them at the start, even if you are not buying them yet. A few things matter.
The floor. Sliding glass walls run on a track at the bottom, and that track needs a level, solid surface. A patio laid with a fall for drainage, or with uneven slabs, may need work. It is much easier to do this before the veranda goes up. We have a separate guide on levelling a sloping patio for sliding doors.
The height. The height under the gutter decides what size of glass panels will fit. A veranda set a little too low can limit your options later.
The posts. Post positions decide where side walls can go and how wide each run of glass will be. Placing posts with future walls in mind avoids awkward gaps.
The power. If you might want lighting, a heater or motorised screens later, run a cable or at least a duct now.
Mention all of this at your survey. If we know what you might add, we can make sure the veranda is ready for it.
The Usual Order
People who build in stages often follow a similar path. The roof first. Then a glass side, usually on the side facing the prevailing wind. Then lighting, once they find themselves out there in the evenings. Then a heater, once they find themselves out there in October. Then, for some, sliding glass across the front, turning it into a glass room for winter.
Each step makes the space usable on more days of the year, and each one is chosen because the last one showed it was needed.

Room to Grow
There is something satisfying about a space that grows with you. It means you never overspend on things you will not use, and it means the covered space evolves as your life does, with children, with retirement, with new habits like working from home. A good veranda is less a finished product than a framework.
A Note on Budget
Building in stages is also a good way to manage cost. The roof is the biggest single investment, and it brings the most immediate benefit: shelter from rain and sun from day one. Side elements, lighting and heating can follow as and when budget allows.
It is worth getting a quote that covers both the initial roof and the likely additions, so you know the full cost and can plan accordingly. Prices for side walls, sliding glass and heating vary a lot by size and specification.

What Not to Delay
Some things are much harder to add later, and worth doing at the start even if they will not be used straight away:
Cables. Power for lights, heaters or motorised screens is far easier to run before the patio and roof go in.
Patio levels. If sliding glass is likely, getting the floor level and solid at the start avoids disruption later.
Drainage. Agreeing where the rainwater goes at the beginning prevents problems later.
Quick Answers
Can sliding glass be added to any veranda? Most of our ranges are designed for it, but it depends on the height, post positions and floor. We check at the survey.
Will added sides look like an afterthought? Not if they are from the same system. Side elements are designed to match the frame colour and profiles.
How long does adding glass take? Usually much less time than the original veranda, often a day or two depending on size.
Ready to talk about your project?
Book a free virtual appointment with our team and we'll talk through your project in detail — no pressure, just straight advice.
Book a Virtual Appointment 💬 WhatsApp Us